This event happened two years ago something serves to illustrate a maintenance task of transmission lines .Caroni
Electrification , CA , EDELCA , a subsidiary of the National
Electricity Corporation under the Ministry of Popular Power for Energy
and Petroleum , performed maneuvers replacement insulator strings in the
three towers that make up the cross section of about Orinoco river , the Palital Guri - line transmission system to 400 thousand volts.In
total seventy-two chains were replaced in the three towers,
twenty-three insulators each, for a total of 1728 replaced isolators ,
which will continue to provide a reliable and quality service to the
Venezuelan population .Juan
Parra, Maintenance Engineer EDELCA team member who coordinated actions ,
recalled that the decision to replace these insulators was made after
the evaluations are conducted periodically throughout the transmission
system."In
routine inspections determined that the corrosive action of the
atmosphere, especially for being on the river and near an industrial
area , was affecting insulators , so he decided to do this preventive
work and replace the insulator strings in towers 55, 56 and 57 Palital Guri - line 400 system , "said Parra.High precision maneuverTo
achieve the replacement of insulator strings , EDELCA personnel planned
special maneuver consisting of three basic steps : first, raise ,
through the use of a special tool trolley for maintaining hot - wire
conductor , weighing
approximately 16 tons , second, disengage the insulator string and then
move it to land and finally , raise new insulator string and put in
place.Despite
the extensive experience of the staff EDELCA similar to this procedure ,
replacement of insulators in crossing the Orinoco River represented a
new challenge.Luis
Acosta , Technical Maintenance Company , said: " procedures that had
already been done in EDELCA for similar work in other crosses gave us a
basis for this work , but this particular crossing was the weight I had,
by the distance that
between tower and tower configuration and four insulator strings in a
driver who has four sub - conductors, resulting in a work that was
unprecedented in the company. "working togetherRealizing
the complexity of this operation , the Board of EDELCA coordinated a
team of flexible working in order to ensure proper planning and
execution of the maneuver. It
featured the participation of workers in the Regional Air Division of
the Directorate of Regional Networks and specialists from the
Departments of Maintenance West, East and South , of the Directorate of
Operation and Maintenance of Transmission .José
Gregorio Ojeda, Lineman Electrician 3 Maintenance Department Air East,
emphasized the high level of rapport achieved between workers of the
Company to achieve the objectives: " We did several brainstorming to
come up with the best solution to board the task until we made the decision together and with professionalism , how to do the job . "
12 Feb 2016
New
Venezuela: EDELCA replace insulators on transmission lines crossing over the River Orinoco
About SOSTENES LEKULE JR
Hi, I`m Sostenes, Electrical Technician and PLC`S Programmer.
Everyday I`m exploring the world of Electrical to find better solution for Automation. I believe everyday can become a Electrician with the right learning materials.
INPECTIONS
Tags
CABLES,
INPECTIONS
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment