Thermit welding steps:
Various
steps involved in the non pressure fusion thermit welding of metal
parts is explained below. The mold is non-repetitive in nature and is
used for repair welds.
1. Clean the joint:
An
oxy-acetylene torch may be used to clean the metal surfaces by heating.
During cleaning all dirt, grease, loose oxides, scale etc., must be
removed.
2. Allow for contraction:
After
cleaning, the part to be welded are to be lined up with a space of
about 1.5 to 6 mm between the ends, depending upon the size of the parts
to be joined.
This space makes you for
i. The contraction of the thermit steel in cooling
ii. The shrinkage of the base metal which has been heated during the welding operation
3. Construct the mold:
After
the parts have been cleaned and spaced properly, the next stage is the
making of the wax pattern from which the mould will be formed and which
must in shape constitude a replica of the eventual weld.
The molding materials should be about 100 mm thick between the wax pattern and the molding box at all points.
The
mold should be provided with the necessary number of pouring gates,
heating gates and risers depending on the size of the weld.
4. Preheating the mold:
The mold prepared as above is then preheated in order to:
i. Melt away and remove the wax thereby leaving a mold cavity in the exact shape of the weld.
ii. Dry the mold thoroughly otherwise the superheated molten metal will form steam within the mold and cause porous weld.
5. Crucible and its charging:
Thermit
mixture is charged in the container knows as crucible or reaction
vessel. This vessel is of conical shape and is lined with magnesia tar
lining.
The outside shell of this vessel is made
up of steel sheet. Located at the bottom of the vessel is a magnesia
stone and magnesia thimble through which the tapping pin is suspended.
The
thimble is plugged by suspending the tapping pin through the thimble
and placing a metal disc above the pin. This disc is then covered with
refractory sand.
After drying the crucible, a
small quantity of the thermit powder is first introduced, the object
being to avoid damage to the refractory sand layer and to cushion off
the plugging material in the bottom of the crucible from the impact of
the full weight of the thermit charge.
6. Igniting the thermit mixture:
A low ignition point thermit in the form of a powder is placed on the top of the thermit in the crucible.
To
initiate the reaction, the low ignition – temperature thermit is
contacted with a hot rod. This ignition immediately starts the reaction
in the main thermit charge.
7. Opening the mold:
The
actual period for which the mold is left unopened depends upon the
dimensions of the weld, being shorter (2 to 3 hours) for small sections
and longer (about 4 hours) for heavy sections. The longer the mould can
be left unopened, the better it is.
8. Finishing the weld:
After
removing the mold, the risers and gates are cut away with a cutting
torch. In case of shafts or parts requiring specific finished contour
the same can be given by either machining and grinding.