Alstom Frame 5 Turbine Assembling Photos - LEKULE

Breaking

5 Nov 2015

Alstom Frame 5 Turbine Assembling Photos


 1st stage nozzle clamp right side
 1st stage nozzle clamp
 1st stage nozzle complete
 1st stage nozzles installed
 accessory coupling
 accessory coupling complete
 1st stage shrouds and 2nd stage nozzles installed
 1st stage nozzles installed
 all pipes installed
 all pipes installed
 all transition pieces in machine
 assembling accessary coupling tunnel
 assembling pipes (2)
 assembling first st. shrouds and second st. nozzles
 assembling exhaust plenum
 assembling exhaust plenum
 assembling pipes
 assembling second stage nozzles
 bad welding exhaust
 bad welding
 bearing nr.1
 bearing no. 2 installed
 bearing no.1 complete
 bellmpouth installed
 bellmpouth installed
 bottom of 1st stage nozzle with pin
 broken bolt in support ring
 cleaned coupling of rotor
 cleaned and repainted bellmouth
 cleaned and repainted bellmouth
 broken cable piping
 cleaning rotor for assembling 1
 cleaning rotor for assembling buckets
 closing bearing no.2
 closing bearing no.2
 compleet bearing nr.1
 combustion chambers installed
 combustion chambers installed
 combustion chamber covers installed
compleet bearing nr.1

No comments: